Prestige Renovation · Dubai
Apartment Renovation Cost
Three finish levels with a transparent rate per m². The exact figure depends on
the size of your property — send us a request and we’ll prepare a quote free of charge.
Cosmetic
from 3,000 AED/m²
Turnkey price: works, materials, furniture and décor
A refresh without removing tiling or flooring. The fastest way to renew a space turnkey.
- Kitchen replacement
- New built-in furniture
- Full furnishing
- New floor coverings
- Furniture material: laminated board (base) or veneer +1,000 AED/m²
Permit: apartment from 1,500 AED, villa from 2,000 AED.
Get a quote →
Most popular
Full Renovation with Replanning
from 6,000 AED/m², by area
Turnkey price: works, materials, furniture and décor
A complete rebuild of the apartment: demolition, new layout, all engineering
systems from scratch.
- Demolition and new layout
- Bathroom tile removal included in the estimate
- Full replacement of electrical and plumbing
- New floors, ceilings, painting
- New built-in furniture
- Furniture material: laminated board (base) or veneer +1,000 AED/m²
| Up to 180 m² | 5,500 AED/m² |
| 180–250 m² | 4,800 AED/m² |
| Over 250 m² | 4,500 AED/m² |
Permit: from 3,500 AED (from 10,000 AED for Nakheel).
Get a quote →
Full Renovation without Replanning
from 4,500 AED/m², by area
Turnkey price: works, materials, furniture and décor
A complete renewal of all surfaces and systems without changing the existing layout.
- Full replacement of electrical and plumbing
- New floors, ceilings, painting
- Bathroom renewal
- New built-in furniture
- Furniture material: laminated board (base) or veneer +1,000 AED/m²
| Up to 180 m² | 5,500 AED/m² |
| 180–250 m² | 4,800 AED/m² |
| Over 250 m² | 4,500 AED/m² |
Permit: apartment from 1,500 AED, villa from 2,000 AED.
Get a quote →
Prestige Renovation · Dubai
How Your Apartment Renovation Works With Us
From the first enquiry to handover — step by step, no surprises.
-
Enquiry and first conversation
You message us on WhatsApp or leave a request on the site. We discuss the
property, your goals and the finish level you want — cosmetic or full renovation.
-
Site visit and preliminary quote
A specialist visits the property and confirms the scope of work. The quote is
prepared free of charge, within 24 hours.
-
Contract with a fixed quote and timeline
The sum agreed at this stage does not change during the project.
Deadlines are written into the contract — for every day of delay, we pay compensation.
-
Developer approval (if replanning is required)
Handled by our own in-house engineering department. Requirements
differ by developer: with Nakheel, for example, we allow an extra 1.5 months minimum
due to separate access passes for each worker, lift restrictions and mandatory
registration of every truck.
-
Demolition and rough works
We do everything ourselves, as the main contractor — from
demolition to engineering systems, our own team works under an on-site foreman,
not an unsupervised outside crew.
-
Furniture from our own workshop
We make wardrobes, kitchens and TV units ourselves — Blum and Hettich
hardware, including tall facades on sandwich panels that won’t warp in Dubai’s heat.
-
Handover and warranty
We hand over a finished apartment with a 3-year warranty on the
completed work.
Honest about timelines. A typical apartment renovation takes
5–8 months depending on the complexity of the project and the
developer’s requirements. We don’t promise unrealistically short timelines just to win
the job — the deadlines we put in the contract are realistic and backed by financial
responsibility for delay. This is often longer than the cheapest contractors promise —
but their promise is rarely kept.
Prestige Renovation · Dubai
Why Clients Choose Prestige Renovation
Eight concrete reasons — no vague talk about “quality” and “reliability”.
01We operate officially, under licence No. 1253807.
02Fixed quote — the sum agreed before work starts does not change during the project.
033-year warranty on completed work.
04Proven brands: Blum, Hettich hardware, Knauf, Mapei, Kerakoll materials, Jotun, ProfiTec paint.
05Custom furniture in our own workshop — including tall facades on aluminium-honeycomb sandwich panels that won’t warp in Dubai’s heat.
06Completed projects range from 3,500 to 16,500 AED/m² — e.g. Dubai Hills Mulberry and Address Beach Resort JBR.
07We work as the main contractor — our own team on site from demolition to handover.
08We approve replanning with any developer — handled by our own engineering department.
Frequently Asked Questions
How is the cost of delivery and material procurement structured?
We usually work on a turnkey basis with a fixed price. Before work begins, we agree
the scope, the material specification and the final cost. After that, procurement,
supplier relations, logistics and purchase-cost control sit entirely on our side.
Fixed Price or Open Book?
Most often we work on a Fixed Price model rather than Open Book. Before signing,
the scope of work and material specification are pinned down in as much detail as
possible: the brand and grade of sanitaryware, tiling, parquet and other flooring,
natural veneer and every other material item that matters.
What is the payment schedule for construction?
Standard structure:
- 20% on signing the contract;
- 10% after the required permits / NOC are obtained;
- 10% after demolition is complete;
- further payments on completion of specific stages, e.g. tiling, wall preparation for painting, etc.
The exact schedule and percentages are fixed in the contract depending on the specific project.
What is not included in the initial quote, and what extra costs can arise?
Our aim is to define the entire scope in as much detail as possible before signing
and to include all agreed works, materials, equipment, appliances, logistics and
related costs in the price. Additional cost can appear in two main cases:
- You decide to change the agreed scope, material or equipment, or to add new works.
- After demolition, hidden defects come to light that objectively could not have been
identified during the preliminary inspection — for example concealed mould, leaks, or
unknown problems in the existing AC system.
In that case we first document the issue, establish the cause, and agree the solution
and cost with you before carrying out any extra work.
Who is responsible for the safety of the apartment, materials and furniture?
If we act as the main contractor and deliver the project fully turnkey, including
construction and furniture, then responsibility for the property, the supplied
materials, furniture and other items within our scope rests with us.
What are the standard renovation timelines for apartments?
A full apartment renovation with replanning usually takes 5–8 months; a cosmetic
renovation, 2–3. The exact time depends on the complexity of the project and the
specific developer’s requirements. With Nakheel, for example, we allow an extra
1.5 months minimum — the bureaucracy is strict: an access pass is issued individually
for each worker, lift-booking restrictions apply, and every truck bringing materials
or removing waste must be registered in the system.
Prestige Renovation Is Right for You If:
- You value honest expert opinion — even when it differs from what you originally planned.
- A transparent quote with no surprises after work begins is a matter of principle for you.
- Real timelines matter — we fix them in the contract and pay compensation for every day of delay, rather than just promising “fast”.
- It matters to you that the renovation is built from quality, safe and durable materials — specific brands like Knauf, Mapei, Blum.
And honestly — if your only selection criterion is the lowest price, rather than
contractually guaranteed commitments (quote, timelines, materials), we are probably
not the best choice for you.