Full Guide: Nakheel Property NOC and Modifications
Sometimes clients reason like this: if you hire separate specialist contractors — one for ventilation, one for plumbing, one for the smart-home system — you can save money, since a main contractor “marks up” their margin on top. On paper, it does look cheaper. In practice, in our experience of the Dubai market, projects like this almost never finish with a good result. Here’s what the client actually runs into.
One contractor physically can’t start their part until another’s section is ready — and since none of them controls the others’ schedules, no one can plan their own work properly. On average, projects like this take twice as long as working with a single main contractor — and on a construction site, time converts directly into money.
The classic scenario: the drywall crew finishes the ceiling, then the AC specialist installs the equipment incorrectly — and the ceiling has to be taken apart and redone. This isn’t a hypothetical risk but a typical situation when independent teams work on site with no single control over the sequence.
When several crews work on site at the same time, the question of “who damaged the wall or floor” becomes practically impossible to resolve — you can’t prove which of the 15–20 people from different contractors carried equipment through and left a mark. In the end, the client alone is responsible for all the damage and the redoing it entails — there’s no one to pass it on to.
A telling case from our practice: we were handling the drywall and painting, while in parallel the client had hired separate teams for the smart-home system, door painting and ventilation. As a result, we had to redo the finished painting countless times — the timeline stretched out by a month, because every day brought fresh damage from the other contractors. The peak: the door team used super-sticky protective tape instead of masking tape, and when they removed it after painting the doors, the top layer of the freshly painted walls came off with it. The low-skilled contractors simply didn’t know masking tape existed — and the client had to bear the cost.
Without a main contractor, coordinating between crews, reconciling work schedules and resolving technical clashes falls to the client — essentially playing the role of head foreman on your own project, without the time or the construction expertise to do it.
Because of the redoing and the drawn-out timelines, the client loses both time and money — and in total, projects like this usually end up more expensive than those where responsibility for the schedule, the quality and the result belongs to a single company, all the way through to handover.
Update Date:06.09.2026
Update Date: 06.09.2026
Мы перезвоним Вам в рабочее время
Aspin Commercial Tower, Sheikh Zayed Rd, Dubai, United Arab Emirates
View on mapThank you for choosing us!
Leave a complaint
Andriy Prokopenko
Leave a request and our manager will contact you as soon as possible.
You can also give us a call right away:
+971 52-625-34-34