Full Guide: Sobha Property NOC and Modifications — How to Obtain an NOC
If your property is in one of Nakheel’s communities — Palm Jumeirah, Jumeirah Islands, Discovery Gardens and others — the modification-approval process runs in two stages: first approval from the management company, then an official NOC through the online portal.
The first stage is getting the Scope of Work approved by the management company. The application is sent to [email protected] with the following documents:
Once the first stage is approved, the application is submitted through the Nakheel portal (application type — “MR: Modification to existing Apartment”). To submit, you’ll need:
Based on Nakheel’s standard approval for apartment modifications, the permitted scope of work usually includes:
Completely prohibited:
The NOC is tied to a specific buyer. The permit does not automatically transfer to a new owner when the property is sold — if the modification wasn’t carried out before the sale, the new buyer must reapply.
Fire-suppression systems are a separate process. An apartment-modification NOC does not cover work on sprinklers, fire pipes or the alarm system — that requires a separate NOC from Dubai Civil Defence, and any fire-suppression changes require prior approval from the management company (OA/FM).
Materials must match the existing ones. The materials used must match those already installed in the property — in their thermal and acoustic insulation properties.
Responsibility for engineering systems lies with the owner and contractor. The developer does not assess the impact of modifications on the existing MEP systems (mechanical/electrical/plumbing) or the structure — that responsibility rests entirely with the applicant and the contractor.
The NOC must be visible on site. A copy of the NOC must be displayed on the apartment’s entrance door for the whole period of the works — for inspection by the developer or authorised persons.
Insurance is mandatory. The contractor must hold valid Third-Party Liability insurance for the entire period of the works covered by the NOC.
Demolition and damage to common areas are the contractor’s responsibility. The owner and contractor are fully responsible for rectifying any damage to common areas caused during the works, at their own expense.
Important: the permit fee is charged per worker individually — if, for example, 5 people are working on site at the same time, that’s AED 375 per month in total, not a fixed sum regardless of crew size.
As with other developers, breaching the NOC conditions at Nakheel ties directly to the owner’s liability: any future leaks, damage from failed waterproofing, or complaints arising from the modification are deemed the sole responsibility of the owner — not the developer, not the management company and not the contractor.
In addition:
Update Date:06.09.2026
Update Date: 06.09.2026
Мы перезвоним Вам в рабочее время
Aspin Commercial Tower, Sheikh Zayed Rd, Dubai, United Arab Emirates
View on mapThank you for choosing us!
Leave a complaint
Andriy Prokopenko
Leave a request and our manager will contact you as soon as possible.
You can also give us a call right away:
+971 52-625-34-34